WWTP Buenos Aires – Tenerife (Spain)

CLIENT

JV ALPI-JOCA

COUNTRY

Spain

YEAR

2019

Category
Depuration

DESCRIPTION:

Construction Project Waste Water Treatment Plant of Buenos Aires (Tenerife, Canary Islands)

 

MAIN FEATURES:

Pumping Station Cabo Los Llanos: The total average flow that reaches the EBAR is 22,000 m3 / day. The objective of the action is the adequacy of the intake manifolds, realization of a new relief, improvement of the roughing and installation of intermediate pumping in the lower area, connection of the network of collectors in the upper zone, new pre-treatment of the entire volume to be pumped to the WWTP of Buenos Aires, remodeling of the existing pumps of the Buenos Aires WWTP, remodeling of the existing pumps the WWTP of Buenos Aires and the submarine outfall, reform and adaptation of the electrical installation and deodorization improvements. ”

* New Drive from the Pumping of Cabo de Llanos to EDAR of Buenos Aires.

* Actions of the WWTP of Buenos Aires: adequacy of input manifolds, new by-pass execution, remodeling of pretreatment and primary settling tanks, construction of new conventional biological treatment for 25,000 m3 / d using 2 of 3 existing secondary decanters, adaptation of biological reactors existing, construction of dehydration facilities of the sludge line corresponding to the new MBR, adaptation of the existing sludge line, deodorization facilities, electrical installation reform and covering of different elements for deodorization.

* Tests of operation of the Pumping Station set of Cabo de Llanos-EDAR of Buenos Aires.

 

SCOPE OF WORK:

  • Study of the current situation.
  • Data collection, field work.
  • Interference study of existing facilities
  • Measurements
  • Budget making.
  • Preparation of the construction project.
  • Advice to the public administration.