DESCRIPTION:
Drafting of the executive project of the regenerated water interconnection network of La Gavia.
MAIN FEATURES:
- More than 15 km of Ductile Castings with nominal diameters between 500mm and 100mm.
- Includes Pipe Jacking DN 1000 mm 107m.
- Four rerservoirs of 2,500 m³, 700 m³, 3,000 m³ and 4,000 m³.
- Pumping stations.
- Wash basins: 4 units.
SCOPE OF WORK:
- Base Project Review.
- Study of starting bases and design data set by the administration.
- I study field works: Topography, geotechnics and drinking water analytics.
- Study of information.
- Study of alternatives from the technical, economic, environmental and social point of view.
- Preparation of the executive project.
- Presentation of the Constructive Project.