DESCRIPTION:
The project includes the preparation of a diagnosis that will provide a technical evaluation of the existing water distribution system, considering the technical guidelines established by COMPESA. From the diagnosis a series of alternatives is proposed to solve the problems detected. Once the best alternative has been selected, it will be developed at a constructive level.
MAIN FEATURES:
- Project population: 578,814 hab. eq.
- The use of data and modeling made through the ARCGIS software version 10.2.2 and the MIKE GIS hydrodynamic simulation software.
SCOPE OF WORK:
- Schedule
- Assembly of the Cartographic Base.
- Diagnosis of the Existing System.
- Preliminary Technical Report
- Environmental and Social Studies.
- Basic project.
- Complementary Studies: Electrical Project, Structural Project, Buildings, Operational Control Project, Automation and Instrumentation, Preliminary Environmental Report and Operation / Maintenance Manual.
- Synopsis of the Project.
- Auxiliary services.
- Topography.
- Geotechnics