Ring Section 5 Madrid (Spain)

CLIENT

Canal de Isabel II

COUNTRY

Spain

YEAR

2009-2011

Category
Site Supervision

DESCRIPTION:

Conduction of pressurized water to the demand zones of the metropolitan crown of the capital and urban development areas settled along the radial axes of the road system of the Community of Madrid.

 

MAIN FEATURES:

Total length = 100 km in 9 sections

PIPELINE:

Driving

– Trunk: 8,700 m

– Branch line: 1,762 m

Helico-welded steel embedded in reinforced concrete

Outside D: 1,626 mm

Q design: 3 m³ / s

Special works: 7 hincas of 2 m diameter and lengths between 40 and 150m

 

SCOPE OF WORK:

  • Review of the Constructive Project and issuance of the Preliminary Report to the Execution of the Works.
  • Supervision of construction works in accordance with the Canal contract conditions.
  • Supervision and Control of the execution of the works.
  • Coordination, Safety and Health, approval of the Health and Safety Plan and monitoring of compliance.
  • Environmental monitoring of the works.
  • Regular meetings with the contractor and the administration.
  • Drafting of the As Built project.