DESCRIPTION STAGE 1:
With this action, the population will have access to potable water and sewage services for a population of 207,364 inhabitants, incorporating 48,000 residential connections.
MAIN FEATURES STAGE 1:
- Drinking water: Equipment 6 wells, Reinforcement 12.9 km driving, Construction 7 reservoirs, Installation 9,795 m driving line and 18,408 m trunk, Construction 18 reduction and bypass cameras, Installation 113,378 m. main networks and 47,404 household water connections.
- Sewerage: Installation of 18,878 m. of collector, Construction of 5 pumping chambers, Installation 4,472 m. of impulsion lines, 310.891 m secondary collectors and 4 tanks of 700 m³, 2,500 m³, 3,000 m³ and 4,000m³
SCOPE OF WORK STAGE 1:
- Elaboration of technical profile (basic project) and technical file (constructive project) of the project for the expansion and improvement of the potable water and sewerage system.
- Basic / complementary studies: Digital Topography Study, Soil Survey and Geotechnics, CIRA Obtaining (No Archaeological Remains Certificate), Evaluation Study
- Environmental Impact, Traffic Study-Road Impact, Social intervention report.
- Procedures and procedures: land, supplies.
- Final design constructive level: System design general and secondary works Potable Water and general and secondary sewer system works, Structural Design, Design.
- Electrical and Electromechanical, Automation, telemetry and SCADA.
- Technical record.
DESCRIPTION STAGE 2:
Preparation of the Definitive Study and Technical File (constructive project), including social intervention. The scope of this action is the Branch North branch of drinking water supply: line of conduction interconnection and reinforcement of Line of Chillón pipeline.
MAIN FEATURES STAGE 2:
North Connection Line: Drinking water line of 10 km and DN 900 mm.
SCOPE OF WORK STAGE 2:
- Corresponding to the project of expansion and improvement of the potable water and sewerage system.
- Basic and complementary studies: Digital Topography Study, Soil and Geotechnical Study, CIRA Obtaining {Certificate of No Archaeological Remains), Environmental Impact Evaluation
- Study, Road Traffic Impact Study, Social intervention report.
- Procedures and procedures: land, supplies.
- Definitive design at constructive level: System design general and secondary works Potable Water and general and secondary sewer system works, Structural Design, Electrical and
- Electromechanical Design, Automation Design, telemetry and SCADA.
- Technical record.